Financial analysis, NPV/IRR, break-even, network diagrams (CPM/PERT), procurement acts, contract types, tort liability, NEC code of ethics. In the Nepal Engineering Council (NEC) licensure examination, exactly 10 questions carrying 1 mark each are set from this section with zero negative marking.
10 Marks
10% of total exam10 MCQs
1 Mark each12 Mins
72 sec / questionNone (0)
Answer all questionsAll study materials, past question papers, and solutions hosted directly for download:
Expected time is t_e = (a + 4m + b) / 6, where a is the optimistic time, m is the most likely time, and b is the pessimistic time.
Under the NEC Act, practicing as an engineer without valid registration or license is a punishable offense subject to fines and/or imprisonment.
Liquidated damages for project delay are capped at a maximum of 10% of the total contract price.