ACtE06 · Chapter 6Software Engineering & OOAD🏛️ Past Licensure QuestionID: bf6e0969
Nepal Government handed over the fast-track project to Nepal Army. After handing in, what type of contract was it?
Nepal Government handed over the fast-track project to Nepal Army. After handing in, what type of contract was it?
Multiple Choice Options
- A
BOT
- B✓ Correct Option
BOOT
- C
Build and Design
- D
Build, Design, Procurement, Subcontracting and all works
Detailed Technical Solution & Explanation
According to standard engineering principles, for Nepal Government handed over the fast-track project to Nepal Army. After handing in, what type of contract was it?, the correct choice is BOOT.
Option Analysis:
•
Option A (BOT): Incorrect. Does not satisfy the technical condition or specifies an alternate/invalid property.
•
Option B (BOOT): Correct. Valid technical statement directly addressing the question requirement.
•
Option C (Build and Design): Incorrect. Does not satisfy the technical condition or specifies an alternate/invalid property.
•
Option D (Build, Design, Procurement, Subcontra...): Incorrect. Does not satisfy the technical condition or specifies an alternate/invalid property.
Reference: Mock Test 02NEC Licensure Syllabus